2026 Commercial Solar Deadline: Lock in your 30-50% tax credit by June 1, 2026.

Lock In

South Bay Manufacturing Hub

Torrance Solar & Electrical

Power your Torrance business with clean energy. From aerospace facilities to manufacturing plants, Keen Energy delivers turnkey commercial solar solutions that maximize SCE incentives.

800MW+

Founder Experience

30+

Years Leadership

C-10

Licensed

Why Solar in Torrance

Ideal Solar Conditions

  • South Bay location with excellent sun exposure
  • Coastal climate moderates panel temperatures
  • Large industrial rooftops ideal for solar
  • Strong return on investment for manufacturers

SCE Utility Benefits

  • Net Energy Metering (NEM) credits
  • Demand charge reduction strategies
  • Time-of-use rate optimization
  • Federal and state tax incentives

Industries We Serve

Manufacturing

Energy-intensive operations with significant savings potential.

Aerospace

Defense contractors and aviation suppliers reducing costs.

Healthcare

Medical facilities with critical power reliability needs.

Automotive

Dealerships and service centers powering operations.

Our Process

1

Assessment

We analyze your facility, energy usage, and SCE rate schedule to design the optimal system.

2

Design

Custom engineering for your Torrance property, maximizing production and ROI.

3

Installation

Professional installation with full SCE interconnection and permitting handled.

Frequently Asked Questions

How much can Torrance businesses save with solar? +
Most Torrance commercial properties see 40-70% reduction in electricity costs. Savings depend on your facility size, energy consumption, and roof space available for solar panels.
Do you handle SCE permitting for Torrance solar projects? +
Yes. We manage all permits, SCE interconnection applications, and city inspections. Our team handles the entire process from start to finish.
What financing options are available? +
We offer multiple options including direct purchase, solar loans, and Power Purchase Agreements (PPAs). Each option has different benefits depending on your business goals.
How long does commercial solar installation take? +
Typical commercial projects take 2-4 months from contract to activation. Timeline varies based on system size, permitting, and SCE interconnection queue.
What other services does Keen Energy provide? +
Beyond solar, we provide battery storage, EV charging stations, and electrical services. Our C-10 license covers all commercial electrical work.

Ready to Go Solar in Torrance?

Get a free assessment for your Torrance business. Our team will analyze your energy needs and design a custom solar solution.

Nearby Service Areas