Project Case Study: Senior Living

600kW Senior Living Solar + Battery in National City

Rooftop solar across multiple buildings, paired with 250kWh of battery storage: a commercial solar and storage project built to cut operating costs on a campus where the power quietly has to work, all day, every day.

600kW

Rooftop Solar

250kWh

Battery Storage

Multi

Building Campus

600kW rooftop solar with elevated racking on S-tile roofs at a National City senior living campus, installed by Keen Energy

What Senior Living Needs From Energy

A senior living community is a 24/7 operation. Heating, cooling, lighting, kitchens, laundry: the loads never really stop, and resident comfort cannot be compromised to manage a utility bill. That makes electricity one of the most stubborn operating costs in the category.

This National City complex needed two things at once: a meaningful, durable reduction in energy costs, and a design that respected the physical reality of the campus: multiple buildings with concrete S-tile and mixed roofing materials that most installers would rather avoid.

The answer was a 600kW rooftop system spread across multiple buildings, paired with 250kWh of battery storage with backup power capability.

Scope Delivered

Full EPC delivery: engineering, procurement, construction, permitting, utility interconnection, and commissioning under a single contract.

600kW Across Multiple Buildings

Rooftop arrays distributed across the campus rather than concentrated on one structure, matching generation to the site's roof real estate.

250kWh Battery Storage

Battery storage with backup power capability. For us, batteries are a financial decision first. Backup is the bonus, not the pitch.

Elevated Racking

Elevated racking engineered for concrete S-tile and mixed roofing materials, a mounting solution chosen for the roofs the campus actually has.

Engineering Choices That Mattered

Racking matched to difficult roofs

Concrete S-tile is unforgiving: it cracks under foot traffic and does not accept standard flat-roof mounting. The design used elevated racking systems suited to S-tile and the campus's mixed roofing materials, instead of forcing a one-size-fits-all product onto the wrong substrate.

Storage integrated from day one

The 250kWh battery was engineered into the system rather than bolted on afterward, with backup power capability included. Under NEM 3.0's reduced export compensation, storage that shifts solar energy into the hours the campus actually uses it is more compelling than ever. See our breakdown of NEM 3.0 for commercial solar.

In-house C-10 crews on an occupied campus

Building on occupied senior housing demands clean staging and disciplined crews. Keen's in-house C-10 electrical crews, state-certified Journeymen and Apprentices, self-performed the work under our EPC model: one contract, one team, one point of accountability.

The Economics of a System This Size

We do not publish client financials. What we can show is the published market math for systems in this class, labeled for what it is:

Illustrative estimate: not this client's actual costs or savings

  • - At the published 2026 SoCal range of $2.20–$3.20 per watt installed before incentives, simple arithmetic puts a 600kW solar system roughly between $1.3M and $1.9M before incentives. Battery storage is additional scope on top of that.
  • - The 30% federal ITC applies, and at 600kW, below the 1MW threshold, the full credit applies without prevailing wage and apprenticeship requirements.
  • - With the 30% ITC plus MACRS, well-designed California commercial systems typically pay back in 5–8 years. Facilities with high daytime consumption sit at the shorter end of that range, and a 24/7 campus consumes most of its solar on site, which is exactly what preserves returns under NEM 3.0.
  • - Demand charges make up 30-70% of many commercial electric bills, which is a big part of why pairing storage with solar can change the financial picture, not just the resilience picture.

Your buildings, rate schedule, and load profile will produce different numbers. Clear numbers. No sales pressure. We will model your campus before you commit to anything.

What This Project Proves for Similar Buyers

If you operate senior living, assisted living, or any multi-building residential campus, this project shows that difficult roofs are a mounting-system problem, not a deal-breaker; that solar and storage can be delivered across multiple occupied buildings under one EPC contract; and that battery backup capability can ride along with a system whose primary job is cutting operating costs.

Keen Energy serves multifamily and campus properties across San Diego and Chula Vista. After commissioning, our O&M services keep systems producing for the long term. Coastal-adjacent sites in particular benefit from a real maintenance plan, as we cover in our guide to coastal commercial solar O&M.

Get a Free ROI Analysis for Your Campus

No cost. No obligation. Just clear numbers on what solar and storage can do for your buildings.

No obligation. No pressure. Just an honest assessment.
We never share your info. Privacy Policy

Thank You!

We've received your request and will be in touch within 24 hours.

Or call now: (949) 877-8008